• Home
  • Contact
  • Sitemap
  • Members only
  •  

    Torresol Energy Launches Commercial Operations of Twin Solar Thermal Plants in Spain


    Valle 1 and Valle 2 will produce 320 GWh per year

    Torresol Energy, a joint venture between Masdar – Abu Dhabi’s renewable energy company and SENER – the Spanish engineering and construction firm, announced today at the World Future Energy Summit in Abu Dhabi that the Valle 1 and Valle 2 plants - two identical 50 MW parabolic trough plants, located in Cadiz, in the South of Spain, have commenced commissioning on January 2012. The plants are equipped with thermal storage which will allow them to continue to produce power, even when there is no solar radiation, for up to 7.5 hours.  

    Read more

    A picture of the press conference - from left to right: the Acting Chief Operating Officer of Masdar, Trevor Nash; the Director of Masdar Power, Frank Wouters; the President of Torresol Energy, Enrique Sendagorta; the President and CEO of SENER, Jorge Sendagorta; and the General Manager of Torresol Energy, Alvaro Lorente.