• Home
  • Contact
  • Sitemap
  • Members only
  •  

    Extresol

    Thermo solar power station, located in Torre de Miguel Sesmero (Spain)

    ACS-Cobra is pleased to announce the first synchronization of its 50 MW thermal solar power plant EXTRESOL 1 to the Spanish grid.

    With EXTRESOL 1 connection, ACS-Cobra becomes the world leader in commercially operating STE (CSP) plants, with a total operating capacity of 150 MW.

    As its predecessors ANDASOL 1 and 2, EXTRESOL 1 has a 7.5-hour molten salts storage, which allows a wide dispatchability possibilities to adapt its operation to the grid demand.

    ACS-Cobra is presently building another 4 plants with the same basic technology, applying lessons learned in the first projects to improve constructability, performance and/or reduce installation and operation and maintenance costs in these plants.

    By 2011, ACS will complete the first set of plants totalling 350 MW of dispatchable power.

    ACS, through its 100% subsidiary Cobra, is the EPC contractor in association with SENER of the 17 MW GEMASOLAR central tower project, using molten salts as working and storage fluid with 15-hour capacity, that is presently in advanced construction and will be operational next year.

    ACS is actively pursuing, both as shareholder and constructor, projects in the USA, South America, Southern and Eastern Mediterranean countries, Australia, the Gulf countries and China.


    fherranz(at)eyra.net